aggregates & Industrial materials

morrison quarry

aggregate industries, colorado

Determined resource limits from borehole data. Developed mine plan based on stripping ratios and geographic constraints. Prepared construction level grading and reclamation plans detailing finished topography for wetland development.

kazan soda project

rÍo tinto, turkey

Prepared pre-feasibility reports for proposed trona mine. Designed process/solution cooling ponds. Developed material and liner system technical specifications. Coordinated liner laboratory testing program.

o'neal quarry

chemical lime company, alabama

Supervised crews on day and night shift, managed the contract driller and contract blaster, completed quarry sequencing plans based on the varying demands of 2 lime plants and 7 different quality seams, managed the quality control program, completed all blast designs for the quarry, created the annual mine plan and budget, and filled the position of Quarry Manager during vacations.

ochoa project

intercontinental potash corp., new mexico

Completed a detailed start-up and ultimate design and cost estimate for the dry stack tailings facility which was sized to hold 75 million tons of material. Also, completed the preliminary design layout and cost estimate for the evaporation pond field which was sized for over 4,000 acres.